GALLERY    PART 1  |  PART 2  |  EXIT GALLERY  |  Other Galleries
STEP 14

The pilot hole was drilled until a depth of 200 feet was reached. Note how clean the use of a portable pit and waste trailer has kept the site. Construction in congested sites requires extra effort. Deep groundbeds fail. Current requirements are continuous. The use of a Replaceable Deep Anode System is very economical and makes replacement easy.

To The Last Page To The Next Page
Company | Calculators | Cathodic Protection | Electrical Grounding | Hot Links | Contact Us


Webmaster

© Copyright 1997 Loresco International


website design