|
STEP 11
The casing shown on the right of this photo represents all the materials necessary to build a Replaceable Deep Anode System. The active portion of the deep groundbed contained forty feet of perforated plastic casing. Solid plastic casing from the active zone upward maintains hole integrity.
 |
|