GALLERY
PART 1
|
PART 2
|
EXIT GALLERY
|
Other Galleries
STEP 38
This photo shows the site after all the wash pipe was removed and the equipment was taken off site. The new anode lead has been pulled through an underground conduit to the rectifier (out of picture on the left). Note that there is no mess.
Company
|
Calculators
|
Cathodic Protection
|
Electrical Grounding
|
Hot Links
|
Contact Us
Webmaster
© Copyright 1997 Loresco International
website
design