GALLERY    PART 1  |  PART 2  |  EXIT GALLERY  |  Other Galleries
STEP 38

This photo shows the site after all the wash pipe was removed and the equipment was taken off site. The new anode lead has been pulled through an underground conduit to the rectifier (out of picture on the left). Note that there is no mess.

To The Last Page To The Next Page
Company | Calculators | Cathodic Protection | Electrical Grounding | Hot Links | Contact Us


Webmaster

© Copyright 1997 Loresco International


website design