GALLERY    PART 1  |  PART 2  |  EXIT GALLERY  |  Other Galleries
STEP 27

Crew member holds new anode which is ready for installation. The new anode is a 50 ft. length of .125 in. Pt-Nb-Cu attached with a single No. 8 HMWPE lead wire. The wire has been pre-measured to place the anode between 185 to 235 ft.

To The Last Page To The Next Page
Company | Calculators | Cathodic Protection | Electrical Grounding | Hot Links | Contact Us


Webmaster

© Copyright 1997 Loresco International


website design